Product Categories
Social Media
Home > Knowledge > Content
Pipe Clamp Installer
- Jun 08, 2017 -

1. Assembled on the welding plate, before assembly, in order to better determine the direction of the clip, it is recommended that the first mark in the fixed place, after welding, embedded in the lower part of the tube clamping body, put on the need to fix the tube, and then put on the other half of the tube clamp and cover plate, screw tightening, avoid direct welding has been installed in the bottom plate of the Tube folder.
2. On the guide rail, rail can be welded on the basis, or screw fixed, then the guide nut pushed into the rail, and turn 90 degrees, the next half of the tube clamping into the nut, put on the need to fix the tube, and then put on the upper half of the tube clamp and cover plate, with screws fixed.
3. Stack up assembly, rail can be welded on the basis, or with screws fixed, first installed up and down half a tube clamping body, put on the need to be fixed pipe and then put half of the tube clamp body, with screws fixed, through the loose cover plate to prevent it from turning, and then install a second clamp, the method ibid.
4. Bending pipe assembly, assembly bending pipe, should be directly in the front of the elbow and the back of the Castor with the use of the Custer pipe clamp, suggested that such a support point should be fixed position.